Superseded documentation checkpoints — 2026-09-12
The owner requested one correct documentation set. PROJECT_STATE.json is the single editable observed checkpoint. Generated views are checked by CI. GitHub/provider evidence remains live authority in its own domain.
All previous current-state wording and reconciliation overlays below are SUPERSEDED as current instructions. Original facts and acceptance evidence remain available at immutable Git references; no runtime capability or historical receipt is deleted by this reconciliation. Dated closeouts, daily logs and ledger entries are event history, not competing current checkpoints.
README.md
docs/PROJECT_STATE.json
docs/CURRENT_HANDOFF.md
docs/STATUS_CHECKPOINT.md
docs/CONTINUITY_MEMORY.md
docs/WORK_QUEUE.md
docs/FUTURE_ROADMAP.md
docs/TOOLS_REGISTRY.md
docs/CAPABILITY_BASELINE.md
docs/ACTIVITY_CALENDAR.md
docs/PROJECT_STATE_RECONCILIATION_20260904.json
docs/PROJECT_STATE_RECONCILIATION_20260905_AGENT_INFERENCE.json
docs/PROJECT_STATE_RECONCILIATION_20260906_SDK.json
docs/PROJECT_STATE_RECONCILIATION_20260907_REVENUE.json
The full former capability matrix is also retained locally in CAPABILITY_BASELINE_PRE_20260912.md. Its preservation requirements and the SDK supplement remain mandatory for affected implementation changes.
Schema migration: PROJECT_STATE.json 1.12 → 2.0. Product and operator_contract are preserved; stale per-domain snapshots and overlay instructions are replaced by scoped facts with evidence and observation dates. The repository code-reference audit found the operator-contract validator as the executable consumer of PROJECT_STATE.json; it retains its required contract fields.
The earlier private-main plan-gate instructions are also superseded as current operating instructions: preserved P0-2 document. Its provider-enforcement acceptance criteria remain in the current control-objective page.
อัปเดตล่าสุด